After 3months hard work, the ultra large launching girder equipment has been assembled sucessfully at Hansal Group`s mechanical manufacturing base.
Hansal Group has fabricated all the steel components of the equipment with total weight over 1000ton, the main frame is truss structure, the upper and lower chords are connected with top and bottom beams by pin bolt, the supports and launching systems are mainly box frames,
This is the first time for us to fabricate such large size of LG equipment, but we finally made it with our hard work, profressional management and complete QA/QC system.