The segmental mould fabricated for one Austrialia client has been passed the final FAT inspection carried out by the client`s respresentative, total 3sets of mould, each mould shall be fully preassembled and checked before delivery, besides check the panel flatness and connection joints, the motions of dismantling the mould also need to be simulated, ensure no any connectional or functional problem at site.