The steel structures of one lifting equipment specialized in the erection of bridge precast beams have been almost completed and at the end stage of trial assembly, this equipment with total weight of 200ton, the whole strcuture includes three main parts : main girder, A frame and T46 steel structures, the scope of work includes material, fabrication, NDT, trial assembly, sandblasting and painting as well as deliver to Tianjin port.